Test Analysis & Reporting

Test Analysis & Reporting

Our Analysis & Reporting is carried out to fully comply with the requirements of the various Testing Specifications and Water Industry Information & Guidance Notes. These include:

  • WIS 4-01-03:2024 - Specification for hydrostatic pressure testing of polyethylene and polyethylene barrier water supply pipelines and sewer rising mains
  • IGN 4-01-03 2015: Issue 2 - Guide to Pressure Testing of Pressure Pipes and Fittings for use by Public Water Suppliers
  • BS EN 805:2025 - Water supply - Requirements for systems and components outside buildings.
  • Uisce Éireann Code of Practice for Water Infrastructure (2025) - Connections and Developer Services - Design and Construction Requirements for Self-Lay Developments.
  • Water UK – Principles of Water Supply Hygiene - March 2017.
  • IS 391:2020 - Fire mains for buildings - Installation, Commissioning, Maintenance and Testing.
  • BS 9990:2015 Non-Automated Fire-Fighting Systems in Buildings – Code of Practice.
  • Water UK National Guidance Document on The Provision of Water for Fire Fighting - January 2017 3rd Edition.
  • ASME Boiler and Pressure Vessel Code; Section VIII; Division 1; 2019. UG-99 Standard Hydrostatic Test.
  • Manufacturer Specific Hydro Test Requirements / Procedures.

From our years of practical experience and thorough understanding of testing procedures, requirements and standards we have become the foremost authority on Pressure Testing and Pre-Commissioning in the country.

We make ourselves available to discuss the results, their possible meanings and provide guidance in overcoming any failures.